Analisis Peramalan Permintaan dan Persediaan Produk Baut Menggunakan Metode Time Series dan Safety Stock di PT. DRA Component Persada

Authors

  • Marjuki Zulziar Universitas Pamulang
  • Andi Purnomo
  • Wanto Sarwoko Universitas Pamulang

DOI:

https://doi.org/10.32493/jitmi.v8i1.y2025.p82-92

Keywords:

forecasting, Time Series, Moving Average, exponential smoothing, Safety Stock, weighted moving average

Abstract

DRA Component Persada is a manufacturing company that produces various types of bolts. The main problem faced by companies is unstable fluctuations in demand, so that sometimes there is a buildup of stock or a shortage of inventory in the warehouse. The aim of this research is to analyze forecasting demand and supply of bolt products at PT. Dra Component Persada. To overcome this, this research uses the Time Series forecasting method which includes Moving Average, Weight Moving Average, and Exponential Smoothing to determine future demand and the Safety Stock method to overcome demand instability. From the results of calculations carried out by the author, the Exponential Smoothing model with a = 0.2 is the optimal forecasting model with the smallest error level, namely with a Mean Absolute Deviation (MAD) of 1,218,085, a Mean Squared Error (MSE) of 1,886,215,000,000 , and the Mean Absolute Percentage Error (MAPE) is 2.74%. The forecast for the coming period is predicted to be 4,440,637 pcs, while the safety stock required is 393,215 pcs with a service level of 95%. It is hoped that the application of forecasting and safety stock methods can increase stock management efficiency and better meet customer needs.

 

References

Alfatiyah, R., & Purnama, P. A. (2016/2017). Perencanaan Pencatatan KWH Meter xdengan metode Time Series di PT. Graha Bara Lestari. Jurnal Ilmiah Dan Teknologi, 1858-4993.

Alfatiyah, R. (2017). Perencanaan Produksi Minyak Telon Ukuran 100 Ml Dengan Metode Time Series Di PT.

MERPATI MAHARDIKA. Teknik INDUSTRI, 9(25).

Anik, dkk. 2016. Analisis Peramalan Penjualan Untuk Menentukan Rencana Produksi Pada Ud Rifa’i. Jurnal Ekonomi dan Bisnis GROWTH Vol. 14, No. 2, November 2016 :17-30

Ajeng, Sri. (2011). Peramalan Penjualan Untuk Perencanaan Pengadaan Persediaan Buah Durian Di Rumah Durian Harum Bintaro. Program Studi Agribisnis Universitas Islam Negeri Syarif Hidayatullah.

Arthur, David J, Schott, J.D., Martin, J.William. (2000). Manajemen Persediaan. Jakarta: Salemba Empat.

Bastuti, S., & Teddy, T. (2017, December). Analisis Persediaan Barang Dengan Metode Time Series Dan Sistem Distribution Requirement Planning Untuk Mengoptimalkan Permintaan Barang Di Pt. Asri Mandiri Gemilang. In Proceedings (Vol. 2, No. 1).

Candra, A. (2018). Pengendalian persediaan material pada produksi hot mix dengan pendekatan metode Economic Order Quantity (EOQ). Jurnal Ilmiah Teknik dan Manajemen Industri (JITMI), 1(2), 145-153.

https://doi.org/10.32493/jitmi.v1i2.y2 018.p145-153

Erlina. (2002). Manajemen Persediaan. Fakultas Ekonomi Program Studi Akutansi Universitas Sumatera Utara.

Gaspersz, Vincent. (2005). Production Planning And Inventory Control. Jakarta: Gramedia Pustaka Utama.

Herlambang,M (2017). Analisis Perbandingan Peramalan Penjualan Menggunakan Metode Exponential Smoothing dan Metode Adjusted Exponential Smoothing pada Penjualan Modem Andromax pada PT.Smartfren Telecom Tbk.

Ibrahim,Y.(2019). Pengendalian Persediaan bahan baku dalam meningkatkan kelancaran proses produksi pada CV Bagas NF Interior.

Indah, D. R., & Rahmadani, E. (2018). Sistem Forecasting Perencanaan Produksi dengan Metode Single Eksponensial Smoothing pada Keripik Singkong Srikandi Di Kota Langsa. JURNAL PENELITIAN EKONOMI AKUNTANSI(JENSI), Vol 2 No. 1, 10–18.

Maulana, Y. (2020). Perancangan framework decision support system untuk persediaan bahan baku dalam pengendalian proses produksi dengan Odoo Manufacturing di PT. 3A Precise Scale. Jurnal Ilmiah Teknik

dan Manajemen Industri (JITMI), 3(1), 49-58.

Muji Triwibowo. 2017. Analisis Pengendalian Persediaan Bahan Baku Kain Tas 600D Dengan Metode Economic Order Quantity (EOQ) Guna Meminimumkan Biaya pada CV. Kane 197, Vol 3, No. 1.

Nasution, Doly Himatyar, Abadi Ginting. (2013). Usulan Penjadwalan Jam Kerja Lembur dan Upah Kerja Lembur Operator di PT.XYZ. Teknik Industri FT USU Vol 3, No 3.

Nurmutia, S. (2020). Perencanaan material produk sandal dengan metode Material Requirement Planning (MRP). Jurnal Ilmiah Teknik dan Manajemen Industri (JITMI), 3(1), 59-65.

Downloads

Published

2025-03-31

Issue

Section

Articles